| Nama Kapal | : | MT. ENERGY ATHENA | Nama Perusahaan | : | PT.PILAR LIMA SAMUDERA |
| Nahkoda | : | CAPT. VLADIMIR TRETYAK | Jenis Kapal | : | CHEMICAL TANKER / TANGKI KIMIA |
| Bendara / Call Sign / IMO | : | IM / MHCJ3 / 9891440 | GT / DWT | : | 29597 / 49812 |
| Panjang / Lebar | : | 182.9 / 32.2 | Draft Depan / Belakang | : | 7 / 8 |
| Draft Tengah / Max | : | / 12 | Status NLE | : | Tidak |
| Asal / Tujuan | : | MERAK / SINGAPORE | PKK / SPB | : | PKK.LN.IDGRE.2308.000581 / SPB.IDGRE.0823.0000669 |
Data Bongkaran
| No | Nama Barang | Jenis barang | Unit/Ton/M3 | No BL | Shipper | Consignee | B/M | LHV | NTPN |
|---|
Data Muatan
| No | Nama Barang | Jenis barang | Unit/Ton/M3 | No BL | Shipper | Consignee | B/M | LHV | NTPN |
|---|
History Kapal
| Nomor PKK | Pelabuhan | ETA | Asal | ETD | Tujuan | Action |
|---|
Data Billing
Total PNBP : Rp. 56,828,096
| Kode Billing | Nama Wajib Bayar | NTPN | NTB | Total |
|---|